Rehabilitation of Zara Ma’in

Name of Employer:
Water Authority of Jordan / USAID
Duration:
36 months
Date of Completion:
May, 2022
Location:
Amman , Jordan
Sector:
Electromechanical Works

Rehabilitation of Zara Ma’in Water System, Pump Station 1, 2, 3, 4 and 5 – New Pump and Replacement Pumps.

The Replacement and Installation of twenty-five Vertical Turbine Pumps in PS 1, 2, 3, 4, and 5

With a total head range between 248.2 to 298.2 for the five pumping stations.

And design flow of 400 l/s for each pumping station.