- Replacement of 3 Vertical Pumps and motors at the intake pumping station.
- Replacement of 15 Horizontal Pumps and 12 motors at pumping station 1, 2, 3, 4 and 5.
- Replacement of two (2) traveling screens for channel 1400 mm
- Replacement of two (2) traveling screens for channel 1900 mm
- Replacement of Check Valves and Electric Ball Valves
- Replacement of five (5) End Caps of Header Pipe
- Design and construct new concrete foundations for the pumps and motors.
- All electrical and mechanical works